Client: Private developer.
Location: OneSchool Global NZ, Wellington Campus, Grenada North, Wellington.
Scope of works: Drainage – sewer and stormwater; water reticulation; service trenching; car parks – earthworks, kerb and channel, pavement construction, sealing; playing fields – subsoil drainage, kerbing, pavement construction.
Stats: 478m of sewer and stormwater pipe laid, 1710m2 pavement preparation, 400m kerb and channel.
Challenges: Weather, design changes.
Solutions: We used our experience to assist in overcoming design challenges.